Skip to content
Holtec InternationalHoltec International
  • Company
    • Corporate Information
      • Company
      • Mission, Vision & Values
      • Worldwide Locations
      • Cloud-Based Applications
      • Cybersecurity
    • Leadership and Governance
      • Corporate Leadership
      • Advisory Council
      • Governance and Ethics
    • Safety & Quality
      • Quality Assurance
      • Corporate Safety Culture
      • Nuclear Safety Culture
      • Personnel Safety
      • Licensing
  • Products
    • Clean Energy Solutions
      • Holtec’s Clean Energy Triad
      • SMR-300
      • Green Boiler Technology
      • Air-Cooled Condensers
      • HI-THERM HCSP
    • Heat Transfer Equipment
      • Water-Cooled Condensers
      • Feedwater Heaters
      • Heat Exchangers
      • Innovative Heat Transfer Products
    • Nuclear Fuel & Waste Management
      • HI-STAR
      • HI-STORE CISF
      • HI-STORM
      • Multi-Purpose Canisters
      • HI-TRAC
      • HI-SAFE®
      • Wet Fuel Storage Systems
    • Innovative Technologies
      • HI-TRAN Heavy Load Hauler
      • Neutron Absorber Material
      • HI-LIFT
      • Forced Helium Dehydrator
      • HERMIT
      • Variable Elevation Cask Pedestal (VECASP)
  • Services
    • Palisades Restart
    • Decommissioning
    • Manufacturing
    • Civil Construction
    • Site Services
    • Engineering & Consulting Services
  • Media Room
    • News & Media
      • Holtec Highlights
      • Videos
      • Marketing Materials
      • Quick Facts
      • Outreach & FAQs
    • Publications
      • Patents
      • Technical Bulletins
      • Technical Papers
      • Trademarks
    • Latest News
      • 2025: A Momentous Year for SMR-300 and Palisades Restart Programs
      • India Enacts the Groundbreaking SHANTI Bill 2025, Enabling Private Sector Ownership in the Nuclear Power Sector to Turbocharge Nuclear Plant Construction, Decarbonize the Environment and Invigorate its Economy
      • Chinshan Power Plant, Taiwan
        Holtec Awarded Contract to Build Sheltered Used Fuel Storage Facilities and Provide Associated Systems and Components for Taiwan’s Chinshan and Kuosheng Plants
  • Careers
  • Suppliers
    • Supplier Diversity
    • Supplier Registration
    • Acquisition and Supply Chain
  • Contact Us
  • Toggle website search
Search this website
Menu Close
  • Company
    • Corporate Information
      • Company
      • Mission, Vision & Values
      • Worldwide Locations
      • Cloud-Based Applications
      • Cybersecurity
    • Leadership and Governance
      • Corporate Leadership
      • Advisory Council
      • Governance and Ethics
    • Safety & Quality
      • Quality Assurance
      • Corporate Safety Culture
      • Nuclear Safety Culture
      • Personnel Safety
      • Licensing
  • Products
    • Clean Energy Solutions
      • Holtec’s Clean Energy Triad
      • SMR-300
      • Green Boiler Technology
      • Air-Cooled Condensers
      • HI-THERM HCSP
    • Heat Transfer Equipment
      • Water-Cooled Condensers
      • Feedwater Heaters
      • Heat Exchangers
      • Innovative Heat Transfer Products
    • Nuclear Fuel & Waste Management
      • HI-STAR
      • HI-STORE CISF
      • HI-STORM
      • Multi-Purpose Canisters
      • HI-TRAC
      • HI-SAFE®
      • Wet Fuel Storage Systems
    • Innovative Technologies
      • HI-TRAN Heavy Load Hauler
      • Neutron Absorber Material
      • HI-LIFT
      • Forced Helium Dehydrator
      • HERMIT
      • Variable Elevation Cask Pedestal (VECASP)
  • Services
    • Palisades Restart
    • Decommissioning
    • Manufacturing
    • Civil Construction
    • Site Services
    • Engineering & Consulting Services
  • Media Room
    • News & Media
      • Holtec Highlights
      • Videos
      • Marketing Materials
      • Quick Facts
      • Outreach & FAQs
    • Publications
      • Patents
      • Technical Bulletins
      • Technical Papers
      • Trademarks
    • Latest News
  • Careers
  • Suppliers
    • Supplier Diversity
    • Supplier Registration
    • Acquisition and Supply Chain
  • Contact Us

Yearly Archives: 2024

  1. Home>
  2. 2024
Marrying Holtec’s SMR-300 Nuclear Plant with its HI-THERM Hybrid Concentrated Solar Power Plant (HCSP) for Increased Power Generation and Operational Resiliency

Marrying Holtec’s SMR-300 Nuclear Plant with its HI-THERM Hybrid Concentrated Solar Power Plant (HCSP) for Increased Power Generation and Operational Resiliency

  • Post published:December 3, 2024

Holtec International offers clients the option of co-locating the SMR-300™ small modular reactor with HI-THERM HCSP, our hybrid concentrated solar power plant.

Celebrating Thirty Years of Holtec’s Consequential Innovations in Dry Storage and Transport of Used Nuclear Fuel & Non-Fissile High-Level Waste

Celebrating Thirty Years of Holtec’s Consequential Innovations in Dry Storage and Transport of Used Nuclear Fuel & Non-Fissile High-Level Waste

  • Post published:November 13, 2024

As the world leader in safely storing and transporting used nuclear fuel and high level non-fissile waste, our innovative technologies have increased human health and safety and protection of the environment. 

Holtec Successfully Completes an Incident-Free Dry Storage Loading Campaign at Diablo Canyon Ahead of the Planned Schedule, Paving the Way for Continued Plant Operation

Holtec Successfully Completes an Incident-Free Dry Storage Loading Campaign at Diablo Canyon Ahead of the Planned Schedule, Paving the Way for Continued Plant Operation

  • Post published:November 7, 2024

The last of the 12 HI-STORM systems was loaded in late October bringing the total casks safely stored at the facility to 70. This was completed with great effort and coordination by Holtec, Pacific Gas and Electric (PG&E) and Diablo Canyon Power Plant (DCPP). 

Second Used Fuel Loading Campaign at Brazil’s Angra Unit 2 Features Extensive Deployment of Holtec’s Innovative Fuel Repair Device

Second Used Fuel Loading Campaign at Brazil’s Angra Unit 2 Features Extensive Deployment of Holtec’s Innovative Fuel Repair Device

  • Post published:October 29, 2024

The loading campaign, which involved placing 480 used nuclear fuel assemblies into 15 HI-STORM FW dry storage casks, was finished ahead of schedule and without injuries or human performance errors during completion of this project.

Holtec Closes $1.52B DOE Loan to Restart Palisades, Support Revitalization of Domestic Nuclear Industry

Holtec Closes $1.52B DOE Loan to Restart Palisades, Support Revitalization of Domestic Nuclear Industry

  • Post published:September 30, 2024

Progress toward the historic restart of the Palisades Nuclear Power Plant made a monumental step forward today with the announced close of a $1.52 billion loan from the U.S. Department of Energy’s (DOE) Loan Programs Office (LPO).

Palisades Restart Program – Now in the Inspections and Maintenance Phase – Remains on Schedule for Repowering

Palisades Restart Program – Now in the Inspections and Maintenance Phase – Remains on Schedule for Repowering

  • Post published:September 18, 2024

The Holtec Palisades team continues to build upon the momentum of recent progress at the Palisades Nuclear Power Plant in Covert Township, Michigan.

Recent Milestone Achievements Keep Palisades Repowering on Track

Recent Milestone Achievements Keep Palisades Repowering on Track

  • Post published:August 29, 2024

We are pleased to share significant new milestones in our ongoing repowering effort to restart the Palisades Nuclear Power Plant in Covert Township, Michigan.

Palisades Cooling System Upgraded to Counter the Continuing Threat of Global Warming

Palisades Cooling System Upgraded to Counter the Continuing Threat of Global Warming

  • Post published:August 15, 2024

Holtec has successfully developed an innovative embodiment of Palisades cooling water heat exchanger system that is being manufactured at Holtec’s own fabrication plant.

Holtec’s UK Subsidiary Obtains Crucial First-Step Regulatory Approval for its SMR-300 Pressurized Water Reactor in Record Time

Holtec’s UK Subsidiary Obtains Crucial First-Step Regulatory Approval for its SMR-300 Pressurized Water Reactor in Record Time

  • Post published:August 1, 2024

Holtec Britain has set a new record for expeditious regulatory approval by completing the first part of the UK Generic Design Assessment process (GDA) for its SMR-300 nuclear reactor in a mere 10 months.

Holtec Continues the Drive to Solve the Nation’s Spent Fuel Storage Imbroglio

Holtec Continues the Drive to Solve the Nation’s Spent Fuel Storage Imbroglio

  • Post published:June 27, 2024

Holtec joined the U.S. Nuclear Regulatory Commission and the U.S. Federal Government, in filing petitions asking the United States Supreme Court to overturn the Fifth Circuit’s March 2024 ruling and to reinstate the license for the HI-STORE CISF.

  • 1
  • 2
  • 3
  • Go to the next page

News

  • Holtec Highlights
    • 2026
    • 2025
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
  • Videos

Holtec International

Holtec Government Services
Holtec Government Services
Holtec Britain
Holtec Britain
Orrvilon
Orrvilon
Nuclear Consultants International
Nuclear Consultants International
Ukrainian Module Consortium
UMC
Holtec Brasil
Holtec Brasil
Holtec Mexico
Holtec Brasil
Holtec Ukraine
Holtec Ukraine
Holtec Europe
Holtec Europe
Holtec International
Holtec International
Holtec Palisades
Holtec Palisades
Holtec Decommissioning International
HDI
Holtec Manufacturing Division
HDI
Site Services
Holtec Site Services
Holtec Canada
Holtec Canada
Nuclear Power Division
Holtec Canada
Heat Transfer Division
Holtec Canada
Holtec Security International
Holtec Security International
Holtec Taiwan
Holtec Taiwan
SMR
SMR
Oak Ridge Technologies
Oak Ridge
CVN Dismantlement Partners
CVN Dismantlement Partners
previous arrowprevious arrow
next arrownext arrow
  • Facebook
  • LinkedIn
  • Twitter
  • YouTube
Copyright © 2026 Holtec International.  All Rights Reserved.  Privacy Policy.  Holtec Users Group. Supplier Registration. Machine Readable File.
 

Loading Comments...
 

You must be logged in to post a comment.