Nuclear Reactor Vessel Support System | 2022 | US 11,393,598 B2, US 10,726,962 B2 | Granted |
Nuclear Reactor Shroud | 2022 | US 11,289,219 B2, US 9,773,576 B2, US 10,580,539 B2, EP 2 962 306 B1 | Granted |
Optimized Nuclear Fuel Core Design for a Small Modular | 2021 | US 11,205,521 B2 | Granted |
Steam Generator for Nuclear Steam Supply System | 2021 | US 11,120,920 B2, US 10,510,452, US 10,395,783 B2 | Granted |
A Fail-Safe Control Rod Drive System for Nuclear Reactor | 2021 | US 11,094,421 B2, US 10,573,419 B2, US 10,573,418 B2, US 9,496,057 | Granted |
Method for Heating a Primary Coolant in a Nuclear Steam Supply System | 2021 | US 11,031,146 B2, US 10,102,936 B2 | Granted |
Nuclear Fuel Core, Nuclear Fuel Cartridge, and Methods of Fueling and/or Defueling a Nuclear Reactor | 2021 | US 10,923,239 B2, US 9,865,363 B2 | Granted |
Component Cooling Water System for Nuclear Power Plant | 2020 | US 10,672,523 B2, US 9,786,394 B2 | Granted |
Space Saver Flanged Joint for a Nuclear Reactor Vessel | 2020 | US 10,665,357 B2, US 9,892,806 B2 | Granted |
Loss-of-Coolant Accident Reactor Cooling System | 2020 | US 10,665,354 B2, US 10,069,389 B2, JP 6454692, EP 3005374 | Granted |
Shutdown System for a Nuclear Steam Supply System | 2018 | US 10,115,487 B2 | Granted |
Nuclear Power Generation System | 2018 | US 9,922,740 B2 | Granted |
Nuclear Steam Supply System | 2017 | US 9,852,820 B2 | Granted |
Passive Reactor Containment Protection System | 2015 | US 9,786,393 B2 | Granted |